Secondary Navigation:

Small Diggers & Plant

With buoyancy of 350kgs per square metre we can build a pontoon to support machinery from 100kgs to up to 20 tonnes.
The secret of any plant evolution is ensuring that the point loading of the equipment is understood, we always distribute the loading of heavy plant by covering the surface of the pontoon with a range of tracking. We understand the risks involved and always supply pontoons that have a minimum of a 50% safety margin.





